Triple

T10208546
Position Surface form Disambiguated ID Type / Status
Subject Bell Fibe E242267 entity
Predicate instanceOf P0 FINISHED
Object internet service C7194 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: internet service
Context triple: [Bell Fibe, instanceOf, internet service]
  • A. Internet service chosen
    An Internet service is a digital offering that provides users with specific online functionality or resources over a network, such as communication, data storage, or content access.
  • B. internet access project
    An internet access project is an initiative designed to plan, deploy, and manage the infrastructure and services needed to provide reliable, affordable connectivity to targeted users or communities.
  • C. internet infrastructure component
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • D. internet protocol suite
    The internet protocol suite is a conceptual framework of layered communication protocols (including TCP/IP) that defines how data is formatted, addressed, transmitted, routed, and received across interconnected computer networks.
  • E. global computer network
    A global computer network is a worldwide system of interconnected computers and devices that communicate using standardized protocols to share data and resources across vast distances.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d381ae26c48190985abd0e25ee5d04 completed April 6, 2026, 9:49 a.m.
Created at: April 6, 2026, 10:59 a.m.