Triple
T1019937
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Universal CityWalk Orlando |
E22016
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | shopping and dining complex |
C727
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: shopping and dining complex Context triple: [Universal CityWalk Orlando, instanceOf, shopping and dining complex]
-
A.
entertainment complex
An entertainment complex is a large, multi-purpose facility that combines various leisure, recreational, and cultural attractions—such as cinemas, theaters, restaurants, gaming areas, and event spaces—within a single integrated venue.
-
B.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
C.
mixed-use lifestyle center
chosen
A mixed-use lifestyle center is a planned development that combines retail, dining, entertainment, residential, and often office spaces in a walkable, open-air environment designed to create a vibrant, community-oriented destination.
-
D.
urban plaza
An urban plaza is a publicly accessible open space within a city, typically surrounded by buildings and streets, designed to support social interaction, circulation, and civic activities.
-
E.
shopping mall
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493d6e380819097b384986ffc315c |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:41 p.m.