Triple
T1019808
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Comprehensive Everglades Restoration Plan |
E22013
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water resources management plan |
C3134
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water resources management plan Context triple: [Comprehensive Everglades Restoration Plan, instanceOf, water resources management plan]
-
A.
water management project
A water management project is an organized initiative that plans, develops, and operates systems and practices to sustainably collect, store, distribute, and protect water resources for human and environmental needs.
-
B.
water resources programme
chosen
A water resources programme is an organized set of policies, projects, and management activities aimed at sustainably developing, allocating, protecting, and monitoring water resources to meet environmental, social, and economic needs.
-
C.
water pollution control program
A water pollution control program is an organized set of policies, regulations, monitoring activities, and treatment measures designed to prevent, reduce, and manage contaminants entering water bodies to protect human health and aquatic ecosystems.
-
D.
water supply system
A water supply system is an interconnected network of sources, treatment facilities, storage structures, and distribution pipelines designed to deliver safe and reliable water to end users.
-
E.
water transfer project
A water transfer project is a large-scale infrastructure system designed to move water from regions of surplus to regions of deficit through canals, pipelines, tunnels, and related facilities to meet agricultural, industrial, and domestic needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a493d6e380819097b384986ffc315c |
completed | March 1, 2026, 7:30 p.m. |
Created at: March 1, 2026, 7:41 p.m.