Triple

T10196786
Position Surface form Disambiguated ID Type / Status
Subject Infrared Array Camera E238781 entity
Predicate deactivationRelatedTo P67965 FINISHED
Object Spitzer Space Telescope mission end LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Spitzer Space Telescope mission end | Statement: [Infrared Array Camera, deactivationRelatedTo, Spitzer Space Telescope mission end]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: deactivationRelatedTo
Context triple: [Infrared Array Camera, deactivationRelatedTo, Spitzer Space Telescope mission end]
  • A. deactivated
    Indicates that an entity has been turned off, disabled, or rendered inactive so it no longer performs its usual function or role.
  • B. inactivationReason
    Indicates the reason or cause for which an entity, status, or process has been deactivated or made inactive.
  • C. relatedToDetachment
    Indicates a relationship in which one entity is associated with the act, state, or process of separating, disengaging, or being removed from another entity or context.
  • D. ceasedActivityUnder
    Indicates that an entity stopped performing a particular activity while under the authority, influence, or conditions imposed by another entity.
  • E. decommissioningActivity chosen
    Indicates the process or actions involved in taking something out of service, shutting it down, or formally retiring it from use.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84e1ea088190b38162e43d4cfa8f completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cdedcaf6688190938d8e56e29493eb completed April 2, 2026, 4:17 a.m.
PD Predicate disambiguation batch_69cd7c8477648190bc55c56aeec507d3 completed April 1, 2026, 8:13 p.m.
Created at: March 30, 2026, 9:13 p.m.