Triple
T10195606
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | UST Main Building |
E238154
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | earthquake-resistant building |
C240
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: earthquake-resistant building Context triple: [UST Main Building, instanceOf, earthquake-resistant building]
-
A.
seismic-resistant structural system
A seismic-resistant structural system is an engineered arrangement of structural elements and connections designed to safely withstand and dissipate earthquake-induced forces, minimizing damage and preventing collapse.
-
B.
reinforced concrete structure
A reinforced concrete structure is a construction system in which concrete is combined with embedded steel reinforcement to resist both compressive and tensile forces, providing strength, durability, and stability for buildings and infrastructure.
-
C.
engineering structure
An engineering structure is a designed and constructed system of connected components that safely resists and transmits loads to fulfill a specific functional purpose in the built environment.
-
D.
building
chosen
A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
-
E.
earthquake monitoring center
An earthquake monitoring center is a facility that continuously collects, analyzes, and disseminates seismic data to detect earthquakes, assess their impact, and support early warning and emergency response efforts.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84de1b208190bf17bb305b002605 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 9:13 p.m.