Triple

T10190720
Position Surface form Disambiguated ID Type / Status
Subject Eliot station E238024 entity
Predicate isOnFormerRailroadRightOfWay P61989 FINISHED
Object Boston and Albany Railroad E233762 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Boston and Albany Railroad | Statement: [Eliot station, isOnFormerRailroadRightOfWay, Boston and Albany Railroad]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Boston and Albany Railroad
Context triple: [Eliot station, isOnFormerRailroadRightOfWay, Boston and Albany Railroad]
  • A. Boston and Albany Railroad chosen
    The Boston and Albany Railroad was a historic rail line that connected Boston, Massachusetts to Albany, New York, playing a major role in 19th- and early 20th-century transportation and commerce in the region.
  • B. New England Central Railroad
    New England Central Railroad is a regional freight railroad operating primarily in New England, providing vital rail connections between local industries and the broader North American rail network.
  • C. Boston and Maine Railroad
    The Boston and Maine Railroad was a major New England railroad that operated extensive passenger and freight services across Massachusetts, New Hampshire, Maine, and surrounding states from the 19th through the mid-20th century.
  • D. Fitchburg Railroad
    The Fitchburg Railroad was a historic New England rail line that operated across Massachusetts and into Vermont, later becoming part of the Boston and Maine Railroad system.
  • E. Old Colony Railroad
    Old Colony Railroad was a prominent 19th-century New England railroad company that operated extensive passenger and freight services primarily in southeastern Massachusetts and Rhode Island.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: isOnFormerRailroadRightOfWay
Context triple: [Eliot station, isOnFormerRailroadRightOfWay, Boston and Albany Railroad]
  • A. isOnRailway
    Indicates that one entity is positioned on, aligned with, or traveling along a railway track or railway system in relation to another entity.
  • B. operatesOnFormerRightOfWayOf chosen
    Indicates that an entity (such as a route, line, or facility) runs along or uses the previous right-of-way corridor that was once occupied by another transportation or infrastructure alignment.
  • C. partOfRailwayCorridor
    Indicates that one entity is a segment, component, or area belonging to or contained within a specific railway corridor.
  • D. isRailTrail
    Indicates that a path or route is a rail trail, meaning it follows or repurposes a former or existing railway corridor for recreational or transportation use.
  • E. followsFormerRailroad
    Indicates that something is aligned with or traces the route of a former railroad line.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84de1b208190bf17bb305b002605 completed March 30, 2026, 2:12 p.m.
NER Named-entity recognition batch_69cded7eb1148190a2d175163685e233 completed April 2, 2026, 4:15 a.m.
NED1 Entity disambiguation (via context triple) batch_69d317c0c22881909ed388721e80bafd completed April 6, 2026, 2:17 a.m.
PD Predicate disambiguation batch_69cd7c8477648190bc55c56aeec507d3 completed April 1, 2026, 8:13 p.m.
Created at: March 30, 2026, 9:13 p.m.