Triple

T10188165
Position Surface form Disambiguated ID Type / Status
Subject German Naval Laws E236964 entity
Predicate instanceOf P0 FINISHED
Object naval legislation C27247 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval legislation
Context triple: [German Naval Laws, instanceOf, naval legislation]
  • A. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • B. naval office
    A naval office is an administrative entity within a navy responsible for managing operations, logistics, personnel, and documentation related to maritime military activities.
  • C. naval fleet
    A naval fleet is a large, organized group of warships and support vessels operating together under a unified command to project maritime power and conduct naval operations.
  • D. naval defense system
    A naval defense system is an integrated network of sensors, weapons, platforms, and command-and-control components designed to detect, deter, and neutralize maritime threats to ships, fleets, and coastal assets.
  • E. naval administrative office
    A naval administrative office is an organizational unit responsible for managing the paperwork, personnel records, logistics, and regulatory compliance that support the operations of a navy or naval installation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84d7260c8190bfbec36762943f37 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 9:12 p.m.