Triple

T10188126
Position Surface form Disambiguated ID Type / Status
Subject Tirpitz Plan E236963 entity
Predicate instanceOf P0 FINISHED
Object naval expansion program C5367 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: naval expansion program
Context triple: [Tirpitz Plan, instanceOf, naval expansion program]
  • A. naval arsenal
    A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
  • B. military rearmament program chosen
    A military rearmament program is a coordinated, government-directed initiative to expand, modernize, or restore a nation’s armed forces and weaponry in response to strategic, political, or security objectives.
  • C. naval fleet
    A naval fleet is a large, organized group of warships and support vessels operating together under a unified command to project maritime power and conduct naval operations.
  • D. harbour expansion
    Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
  • E. maritime expedition
    A maritime expedition is an organized sea voyage undertaken for a specific purpose such as exploration, research, trade, or military objectives, typically involving specialized vessels, crew, and logistical planning.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84d7260c8190bfbec36762943f37 completed March 30, 2026, 2:12 p.m.
Created at: March 30, 2026, 9:12 p.m.