Triple
T10188126
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tirpitz Plan |
E236963
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | naval expansion program |
C5367
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: naval expansion program Context triple: [Tirpitz Plan, instanceOf, naval expansion program]
-
A.
naval arsenal
A naval arsenal is a specialized military facility where warships are built, repaired, equipped, and supplied with weapons, ammunition, and other naval stores.
-
B.
military rearmament program
chosen
A military rearmament program is a coordinated, government-directed initiative to expand, modernize, or restore a nation’s armed forces and weaponry in response to strategic, political, or security objectives.
-
C.
naval fleet
A naval fleet is a large, organized group of warships and support vessels operating together under a unified command to project maritime power and conduct naval operations.
-
D.
harbour expansion
Harbour expansion is the planned enlargement and enhancement of a port’s physical infrastructure and operational capacity to accommodate increased maritime traffic, larger vessels, and associated economic activities.
-
E.
maritime expedition
A maritime expedition is an organized sea voyage undertaken for a specific purpose such as exploration, research, trade, or military objectives, typically involving specialized vessels, crew, and logistical planning.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d7260c8190bfbec36762943f37 |
completed | March 30, 2026, 2:12 p.m. |
Created at: March 30, 2026, 9:12 p.m.