Triple
T10181304
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Forestville Dam |
E236788
|
entity |
| Predicate | hasNearbyFacility |
P5648
|
FINISHED |
| Object |
Marquette Board of Light and Power hydroelectric facilities
The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
|
E845739
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Marquette Board of Light and Power hydroelectric facilities | Statement: [Forestville Dam, hasNearbyFacility, Marquette Board of Light and Power hydroelectric facilities]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Marquette Board of Light and Power hydroelectric facilities Context triple: [Forestville Dam, hasNearbyFacility, Marquette Board of Light and Power hydroelectric facilities]
-
A.
Holyoke Gas and Electric hydroelectric facilities
The Holyoke Gas and Electric hydroelectric facilities are a network of dams and power stations on the Connecticut River that generate renewable electricity for the city of Holyoke, Massachusetts.
-
B.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
C.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
D.
Shanan Power House
Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
E.
Nunn hydroelectric plant
The Nunn hydroelectric plant is an early hydroelectric power station in Utah notable for pioneering long-distance high-voltage power transmission to support mining and regional development.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Marquette Board of Light and Power hydroelectric facilities Triple: [Forestville Dam, hasNearbyFacility, Marquette Board of Light and Power hydroelectric facilities]
Generated description
The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Marquette Board of Light and Power hydroelectric facilities Target entity description: The Marquette Board of Light and Power hydroelectric facilities are a set of power-generating plants in Michigan that harness river flow to produce electricity for the Marquette area’s municipal utility system.
-
A.
Holyoke Gas and Electric hydroelectric facilities
The Holyoke Gas and Electric hydroelectric facilities are a network of dams and power stations on the Connecticut River that generate renewable electricity for the city of Holyoke, Massachusetts.
-
B.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
C.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
D.
Shanan Power House
Shanan Power House is a hydroelectric power station in Himachal Pradesh, India, that generates electricity using the waters of the Uhl River.
-
E.
Nunn hydroelectric plant
The Nunn hydroelectric plant is an early hydroelectric power station in Utah notable for pioneering long-distance high-voltage power transmission to support mining and regional development.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca84d7260c8190bfbec36762943f37 |
completed | March 30, 2026, 2:12 p.m. |
| NER | Named-entity recognition | batch_69cded315f14819085727bd9b4363d10 |
completed | April 2, 2026, 4:14 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69d3013f0c54819092ee9c2c46fdf69e |
completed | April 6, 2026, 12:41 a.m. |
| NEDg | Description generation | batch_69d3028a4384819094a7daef7287e54f |
completed | April 6, 2026, 12:47 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69d302e9d2688190bc292f8f2287c458 |
completed | April 6, 2026, 12:48 a.m. |
Created at: March 30, 2026, 9:11 p.m.