Triple

T10162838
Position Surface form Disambiguated ID Type / Status
Subject Cancún–Tulum corridor E233931 entity
Predicate instanceOf P0 FINISHED
Object coastal corridor C141 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: coastal corridor
Context triple: [Cancún–Tulum corridor, instanceOf, coastal corridor]
  • A. transport corridor
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • B. development corridor
    A development corridor is a strategically planned geographic area, often aligned along major transportation routes, where concentrated investment in infrastructure, industry, and services is used to stimulate economic growth and regional integration.
  • C. coastal region chosen
    A coastal region is a geographic area where land meets the ocean or sea, characterized by unique environmental, economic, and cultural features shaped by its proximity to the shoreline.
  • D. population corridor
    A population corridor is a geographic or infrastructural pathway that facilitates the movement, interaction, and distribution of people between distinct population centers.
  • E. state scenic corridor
    A state scenic corridor is a designated roadway or linear area recognized and protected by a state for its outstanding natural, cultural, or visual qualities, often with special regulations to preserve its scenic character.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848e80748190b91d1e04d35512c7 completed March 30, 2026, 2:11 p.m.
Created at: March 30, 2026, 9:09 p.m.