Triple

T10160243
Position Surface form Disambiguated ID Type / Status
Subject Elan Valley E233869 entity
Predicate laterDamCompleted P70877 FINISHED
Object Claerwen Dam E854780 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Claerwen Dam | Statement: [Elan Valley, laterDamCompleted, Claerwen Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Claerwen Dam
Context triple: [Elan Valley, laterDamCompleted, Claerwen Dam]
  • A. Claerwen Dam chosen
    Claerwen Dam is a large concrete gravity dam in mid-Wales, forming part of the Elan Valley reservoir system that supplies water to Birmingham.
  • B. Cluny Dam
    Cluny Dam is a hydroelectric dam on Tasmania’s Derwent River that forms part of the state’s power generation and water management system.
  • C. Saville Dam
    Saville Dam is a large masonry dam in Barkhamsted, Connecticut, that creates the Barkhamsted Reservoir, a major water supply source for the Hartford area.
  • D. Derwent Dam
    Derwent Dam is a large historic masonry dam in Derbyshire, England, best known for its role in World War II RAF "Dambusters" training and as a prominent feature of the Upper Derwent Valley.
  • E. Keswick Dam
    Keswick Dam is a concrete gravity dam on the Sacramento River in Northern California that regulates flows and generates hydroelectric power as part of the region’s large federal water management system.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: laterDamCompleted
Context triple: [Elan Valley, laterDamCompleted, Claerwen Dam]
  • A. laterConstruction chosen
    Indicates that one construction event or structure occurred or was built after another in time.
  • B. laterCompletionVersion
    Indicates that one entity is a version of a completion that occurs or is produced later in time than another related version.
  • C. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • D. hasDam
    Indicates that a watercourse, reservoir, or similar feature is impounded or controlled by a specific dam.
  • E. laterStatus
    Indicates that one entity represents a subsequent or resulting status or condition of another entity in time.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848e80748190b91d1e04d35512c7 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cdec5831e481909b48fdfa8f1c670b completed April 2, 2026, 4:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d74fce236481909387829c7cf311a4 completed April 9, 2026, 7:05 a.m.
PD Predicate disambiguation batch_69cd4ba795808190acc9124c98c6e40f completed April 1, 2026, 4:45 p.m.
Created at: March 30, 2026, 9:09 p.m.