Triple

T10160226
Position Surface form Disambiguated ID Type / Status
Subject Elan Valley E233869 entity
Predicate hasPart P35 FINISHED
Object Caban Coch Dam E828715 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Caban Coch Dam | Statement: [Elan Valley, hasPart, Caban Coch Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Caban Coch Dam
Context triple: [Elan Valley, hasPart, Caban Coch Dam]
  • A. Caban Coch Dam chosen
    Caban Coch Dam is a large stone-built dam in the Elan Valley of mid-Wales, forming part of the historic Elan Valley Reservoirs scheme that supplies water to Birmingham.
  • B. Chirkey Dam
    Chirkey Dam is a major arch dam and hydroelectric power station in Dagestan, Russia, known as the highest dam in the country and a key source of electricity in the North Caucasus region.
  • C. Petenwell Dam
    Petenwell Dam is a hydroelectric dam in central Wisconsin that creates Petenwell Lake, one of the state’s largest reservoirs, on the Wisconsin River.
  • D. Nisramont Dam
    Nisramont Dam is a hydroelectric and recreational dam in the Belgian Ardennes, forming a large reservoir on the Ourthe River near La Roche-en-Ardenne.
  • E. Calanda Dam
    Calanda Dam is a hydroelectric dam in Switzerland associated with the Calanda mountain region, used primarily for water storage and power generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca848e80748190b91d1e04d35512c7 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cdec5831e481909b48fdfa8f1c670b completed April 2, 2026, 4:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d74fce236481909387829c7cf311a4 completed April 9, 2026, 7:05 a.m.
Created at: March 30, 2026, 9:09 p.m.