Triple

T1015995
Position Surface form Disambiguated ID Type / Status
Subject ISO/IEC 15288 E21930 entity
Predicate lifeCycleStageCovered P12444 FINISHED
Object concept LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: concept | Statement: [ISO/IEC 15288, lifeCycleStageCovered, concept]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: lifeCycleStageCovered
Context triple: [ISO/IEC 15288, lifeCycleStageCovered, concept]
  • A. lifeCycle chosen
    Indicates the sequence of stages or phases an entity passes through from its beginning, through development and use, to its end or termination.
  • B. lifeStage
    Indicates the specific phase or period in an entity’s development or lifecycle that it is currently in.
  • C. stageOf
    Indicates that one entity represents a particular phase, step, or developmental period within the progression or lifecycle of another entity.
  • D. lifeStatus
    Indicates the current state of an entity’s existence, such as whether it is alive, dead, or in another defined life condition.
  • E. isStageInCareerOf
    Indicates that one entity represents a particular phase or stage within the professional career of another entity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493c68e24819080ed0ee8bcfd5ce0 completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4b7c1e9d08190baf7e81f3777168d completed March 1, 2026, 10:03 p.m.
PD Predicate disambiguation batch_69a4b7238d4c8190b22d6c2ac0ac4911 completed March 1, 2026, 10:01 p.m.
Created at: March 1, 2026, 7:41 p.m.