Triple

T10154977
Position Surface form Disambiguated ID Type / Status
Subject Hoist Dam E232751 entity
Predicate partOf P40 FINISHED
Object Dead River hydroelectric system E812259 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dead River hydroelectric system | Statement: [Hoist Dam, partOf, Dead River hydroelectric system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dead River hydroelectric system
Context triple: [Hoist Dam, partOf, Dead River hydroelectric system]
  • A. Dead River hydroelectric system chosen
    The Dead River hydroelectric system is a network of dams and power stations on Maine’s Dead River that generates hydroelectric power and helps regulate regional water levels.
  • B. Nunn hydroelectric plant
    The Nunn hydroelectric plant is an early hydroelectric power station in Utah notable for pioneering long-distance high-voltage power transmission to support mining and regional development.
  • C. Churchill River hydroelectric system
    The Churchill River hydroelectric system is a large-scale network of dams, reservoirs, and power stations in Labrador, Canada, developed to harness the Churchill River’s flow for electricity generation.
  • D. Flix hydroelectric plant
    The Flix hydroelectric plant is a hydroelectric power station located in the municipality of Flix in Catalonia, Spain, generating electricity from the flow of the Ebro River.
  • E. Snake River hydropower system
    The Snake River hydropower system is a network of dams and related infrastructure along the Snake River that generates hydroelectric power, supports irrigation, and influences regional water management and ecosystems in the Pacific Northwest.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84885e48819088a31b127cf44904 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cdec38f594819088a7eb73fc25feff completed April 2, 2026, 4:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2e6541e488190814e6395f219eb12 completed April 5, 2026, 10:46 p.m.
Created at: March 30, 2026, 9:08 p.m.