Triple

T10154284
Position Surface form Disambiguated ID Type / Status
Subject Illinois Route 59 E232730 entity
Predicate hasJunctionWith P1018 FINISHED
Object Interstate 90 E22104 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 90 | Statement: [Illinois Route 59, hasJunctionWith, Interstate 90]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 90
Context triple: [Illinois Route 59, hasJunctionWith, Interstate 90]
  • A. Interstate 90 chosen
    Interstate 90 is the longest Interstate Highway in the United States, running east–west from Seattle, Washington, to Boston, Massachusetts.
  • B. Interstate 86
    Interstate 86 is an east–west U.S. Interstate Highway in New York and Pennsylvania that serves as a major corridor through the Southern Tier region.
  • C. Interstate 97
    Interstate 97 is a short intrastate Interstate Highway in Maryland that connects the Baltimore area to Annapolis and serves as a key north–south route in the central part of the state.
  • D. Interstate 96
    Interstate 96 is a major east–west freeway in Michigan that connects the state capital Lansing with the Detroit metropolitan area and other key cities.
  • E. Interstate 87
    Interstate 87 is a major U.S. highway that serves as a key north–south transportation route, notably connecting parts of North Carolina and New York.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84885e48819088a31b127cf44904 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cdec38f594819088a7eb73fc25feff completed April 2, 2026, 4:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69de54a30b748190bb791078e9dde442 completed April 14, 2026, 2:52 p.m.
Created at: March 30, 2026, 9:08 p.m.