Triple

T10151716
Position Surface form Disambiguated ID Type / Status
Subject Mokelumne River E232657 entity
Predicate subjectOf P38 FINISHED
Object Mokelumne River Project (PG&E hydroelectric system)
The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
E843125 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mokelumne River Project (PG&E hydroelectric system) | Statement: [Mokelumne River, subjectOf, Mokelumne River Project (PG&E hydroelectric system)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Mokelumne River Project (PG&E hydroelectric system)
Context triple: [Mokelumne River, subjectOf, Mokelumne River Project (PG&E hydroelectric system)]
  • A. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • B. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • C. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • D. Hells Canyon Project
    The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
  • E. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Mokelumne River Project (PG&E hydroelectric system)
Triple: [Mokelumne River, subjectOf, Mokelumne River Project (PG&E hydroelectric system)]
Generated description
The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Mokelumne River Project (PG&E hydroelectric system)
Target entity description: The Mokelumne River Project is a Pacific Gas and Electric Company hydroelectric system that harnesses the Mokelumne River through dams, reservoirs, and powerhouses to generate electricity and provide water storage in California.
  • A. Deschutes Project
    The Deschutes Project is a U.S. Bureau of Reclamation irrigation and water management development in central Oregon that supplies water for agriculture, municipalities, and wildlife habitat along the Deschutes River basin.
  • B. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • C. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • D. Hells Canyon Project
    The Hells Canyon Project is a hydroelectric power complex on the Snake River consisting of multiple dams and reservoirs that generate electricity and provide water management in the Hells Canyon area.
  • E. Klamath Project
    The Klamath Project is a major federal water management and irrigation system in southern Oregon and northern California that supplies water to agriculture, wildlife refuges, and communities in the Klamath Basin.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca84885e48819088a31b127cf44904 completed March 30, 2026, 2:11 p.m.
NER Named-entity recognition batch_69cdec361c7c8190b8fd841d728d5bbe completed April 2, 2026, 4:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2e640d1e0819094d30556ccb958b0 completed April 5, 2026, 10:46 p.m.
NEDg Description generation batch_69d2e750ceb08190bcb2d1b4c248b30d completed April 5, 2026, 10:50 p.m.
NED2 Entity disambiguation (via description) batch_69d2e7c486ec819085ad0019ab12de2a completed April 5, 2026, 10:52 p.m.
Created at: March 30, 2026, 9:08 p.m.