Triple

T10133759
Position Surface form Disambiguated ID Type / Status
Subject Heysham 1 nuclear power station E226802 entity
Predicate secondaryCircuit P92157 FINISHED
Object steam cycle LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: steam cycle | Statement: [Heysham 1 nuclear power station, secondaryCircuit, steam cycle]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: secondaryCircuit
Context triple: [Heysham 1 nuclear power station, secondaryCircuit, steam cycle]
  • A. secondCircuitHolding
    Indicates a legal holding or decision issued by the United States Court of Appeals for the Second Circuit.
  • B. secondaryTo
    Indicates that one condition, event, or factor occurs as a consequence of, or is caused by, another primary condition, event, or factor.
  • C. secondaryHub
    Indicates that an entity functions as a secondary or backup hub in relation to a primary hub within a network or system.
  • D. secondaryTransmissionRoute
    Indicates a non-primary pathway or mechanism through which something (such as a disease, signal, or influence) is transmitted from one entity to another.
  • E. secondaryFunction
    Indicates that an entity has an additional, supporting role or purpose beyond its primary function.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8433ec308190b8b25a6fe359c34c completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cdd33808048190b6023a6cd83fc179 completed April 2, 2026, 2:23 a.m.
PD Predicate disambiguation batch_69cd4ba1d360819087698d04a53cc87e completed April 1, 2026, 4:45 p.m.
PDg Predicate description generation batch_69cd4fed19d481909d2c7ff1114664b6 completed April 1, 2026, 5:03 p.m.
Created at: March 30, 2026, 9:06 p.m.