Triple

T10132760
Position Surface form Disambiguated ID Type / Status
Subject United Kingdom offshore wind sector E226778 entity
Predicate regulator P46 FINISHED
Object Ofgem E510363 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ofgem | Statement: [United Kingdom offshore wind sector, regulator, Ofgem]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ofgem
Context triple: [United Kingdom offshore wind sector, regulator, Ofgem]
  • A. Ofgem chosen
    Ofgem is the government regulator for electricity and gas markets in Great Britain, overseeing energy companies and protecting consumer interests.
  • B. Department of Energy (UK)
    The Department of Energy (UK) was a former government department responsible for national energy policy, including oversight of the electricity and fuel industries.
  • C. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • D. UK Competition and Markets Authority
    The UK Competition and Markets Authority is the United Kingdom’s primary competition regulator, responsible for investigating mergers, markets, and anticompetitive practices to protect consumers and ensure fair competition.
  • E. Central Electricity Board
    The Central Electricity Board was a UK public body responsible for developing and operating the national electricity grid and coordinating power generation before being replaced by later electricity authorities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8433ec308190b8b25a6fe359c34c completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cdd336cbf48190b647c69675d0b06f completed April 2, 2026, 2:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69d3007765048190992c9a146ab0f1f6 completed April 6, 2026, 12:38 a.m.
Created at: March 30, 2026, 9:06 p.m.