Triple

T10132741
Position Surface form Disambiguated ID Type / Status
Subject United Kingdom offshore wind sector E226778 entity
Predicate instanceOf P0 FINISHED
Object offshore wind industry C22281 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: offshore wind industry
Context triple: [United Kingdom offshore wind sector, instanceOf, offshore wind industry]
  • A. offshore wind licensing round
    An offshore wind licensing round is a formal, competitive process through which a governing authority offers defined seabed areas or rights for the exploration, development, and operation of offshore wind energy projects.
  • B. wind power company
    A wind power company is an organization that develops, owns, and operates wind energy projects to generate and sell electricity produced from wind turbines.
  • C. wind power facility
    A wind power facility is an installation that converts the kinetic energy of wind into electrical energy using one or more wind turbines, along with associated infrastructure for control, transmission, and maintenance.
  • D. wind power plant
    A wind power plant is a facility that converts the kinetic energy of wind into electrical energy using multiple wind turbines and associated infrastructure.
  • E. maritime industry chosen
    The maritime industry encompasses the global network of activities, services, and infrastructure involved in the design, construction, operation, and regulation of ships and marine transport for cargo, passengers, and offshore resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8433ec308190b8b25a6fe359c34c completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 9:06 p.m.