Triple

T10132702
Position Surface form Disambiguated ID Type / Status
Subject ScottishPower transmission network E226777 entity
Predicate partOf P40 FINISHED
Object Great Britain electricity transmission system E790448 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Great Britain electricity transmission system | Statement: [ScottishPower transmission network, partOf, Great Britain electricity transmission system]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Great Britain electricity transmission system
Context triple: [ScottishPower transmission network, partOf, Great Britain electricity transmission system]
  • A. South Western Electricity Board
    The South Western Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity across the south-west of England before industry privatization.
  • B. Central Electricity Authority
    The Central Electricity Authority is a statutory body under the Government of India responsible for overseeing and advising on the development, planning, and technical coordination of the country’s power sector.
  • C. Great Britain electricity market chosen
    The Great Britain electricity market is the competitive wholesale and retail system through which electricity is generated, traded, transmitted, and supplied to consumers across England, Scotland, and Wales.
  • D. Southern Electricity Board
    The Southern Electricity Board was a regional public utility in the United Kingdom responsible for distributing and supplying electricity to consumers in the southern part of England before industry privatization.
  • E. Central Electricity Generating Board
    The Central Electricity Generating Board was the state-owned body responsible for electricity generation and bulk transmission in England and Wales from the late 1950s until privatization in the early 1990s.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8433ec308190b8b25a6fe359c34c completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cdd336cbf48190b647c69675d0b06f completed April 2, 2026, 2:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2e5ce3fcc8190b1d07dbba34d6bff completed April 5, 2026, 10:44 p.m.
Created at: March 30, 2026, 9:06 p.m.