Triple
T10132697
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ScottishPower transmission network |
E226777
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-voltage power network |
C7916
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-voltage power network Context triple: [ScottishPower transmission network, instanceOf, high-voltage power network]
-
A.
power system
chosen
A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
-
B.
high-voltage generator
A high-voltage generator is a device that converts available electrical or mechanical energy into controlled, significantly elevated voltage levels for applications such as testing, research, and specialized industrial processes.
-
C.
electric power station
An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
-
D.
electric utility
An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
-
E.
regional transmission organization
A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8433ec308190b8b25a6fe359c34c |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 9:06 p.m.