Triple

T10132696
Position Surface form Disambiguated ID Type / Status
Subject ScottishPower transmission network E226777 entity
Predicate instanceOf P0 FINISHED
Object electricity transmission system C7916 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electricity transmission system
Context triple: [ScottishPower transmission network, instanceOf, electricity transmission system]
  • A. power system chosen
    A power system is an interconnected network of generation, transmission, distribution, and control components designed to produce and deliver electrical energy reliably and efficiently to end users.
  • B. regional transmission organization
    A regional transmission organization is an independent entity that coordinates, controls, and monitors the operation of the electric power transmission grid over a large geographic area to ensure reliable and efficient electricity delivery and competitive wholesale power markets.
  • C. electric power station
    An electric power station is a facility where various primary energy sources are converted into electrical energy for distribution to homes, businesses, and industries.
  • D. electric utility
    An electric utility is an organization that generates, transmits, and distributes electrical power to consumers while managing infrastructure, reliability, and regulatory compliance.
  • E. electric transport system
    An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca8433ec308190b8b25a6fe359c34c completed March 30, 2026, 2:09 p.m.
Created at: March 30, 2026, 9:06 p.m.