Triple

T10130797
Position Surface form Disambiguated ID Type / Status
Subject Bhote Koshi River E226331 entity
Predicate hasHydropowerProject P15311 FINISHED
Object Upper Bhote Koshi Hydroelectric Project
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
E842765 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Upper Bhote Koshi Hydroelectric Project | Statement: [Bhote Koshi River, hasHydropowerProject, Upper Bhote Koshi Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Upper Bhote Koshi Hydroelectric Project
Context triple: [Bhote Koshi River, hasHydropowerProject, Upper Bhote Koshi Hydroelectric Project]
  • A. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • D. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • E. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Upper Bhote Koshi Hydroelectric Project
Triple: [Bhote Koshi River, hasHydropowerProject, Upper Bhote Koshi Hydroelectric Project]
Generated description
The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Upper Bhote Koshi Hydroelectric Project
Target entity description: The Upper Bhote Koshi Hydroelectric Project is a run-of-river hydropower plant in Nepal that harnesses the steep gradient and strong flow of the Bhote Koshi River to generate electricity for the national grid.
  • A. Upper Karnali Hydropower Project
    The Upper Karnali Hydropower Project is a major planned run-of-river hydroelectric development in Nepal designed to harness the Karnali River for large-scale power generation and regional energy export.
  • B. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • C. Nachtigal Hydropower Project
    The Nachtigal Hydropower Project is a major hydroelectric dam and power station in Cameroon designed to significantly boost the country’s electricity generation capacity.
  • D. Karot Hydropower Project
    The Karot Hydropower Project is a major run-of-river hydroelectric power plant on the Jhelum River in Pakistan, developed under the China–Pakistan Economic Corridor to boost the country’s electricity generation capacity.
  • E. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca843057b48190a86730167f5d6b98 completed March 30, 2026, 2:09 p.m.
NER Named-entity recognition batch_69cdd33438988190be45878f98695816 completed April 2, 2026, 2:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2cc7c50b08190a04aa2f58a6c300a completed April 5, 2026, 8:56 p.m.
NEDg Description generation batch_69d2cecd67448190a28a90148ad83c20 completed April 5, 2026, 9:06 p.m.
NED2 Entity disambiguation (via description) batch_69d2cf4d259881909f44bf1ec39524de completed April 5, 2026, 9:08 p.m.
Created at: March 30, 2026, 9:05 p.m.