Triple

T1012920
Position Surface form Disambiguated ID Type / Status
Subject Nevada Test and Training Range E21862 entity
Predicate instanceOf P0 FINISHED
Object United States Air Force installation C1086 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: United States Air Force installation
Context triple: [Nevada Test and Training Range, instanceOf, United States Air Force installation]
  • A. United States Air Force base
    A United States Air Force base is a military installation that supports Air Force operations through facilities for aircraft, personnel, training, logistics, and command and control activities.
  • B. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • C. military installation chosen
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • D. reserve component of the United States Air Force
    The reserve component of the United States Air Force is the part-time military force composed of Air Force Reserve and Air National Guard units that support and augment the active-duty Air Force during peacetime and wartime operations.
  • E. major command of the United States Air Force
    A major command of the United States Air Force is a large, top-level organizational unit responsible for directing and overseeing a broad functional or geographic segment of the Air Force’s mission, resources, and operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493c68e24819080ed0ee8bcfd5ce0 completed March 1, 2026, 7:30 p.m.
Created at: March 1, 2026, 7:41 p.m.