Triple
T10128450
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metropolitan Green Belt |
E226274
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planning policy designation |
C13653
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planning policy designation Context triple: [Metropolitan Green Belt, instanceOf, planning policy designation]
-
A.
planning district
A planning district is a defined geographic area used by governments or organizations to coordinate land use, infrastructure, and development policies.
-
B.
town planning policy
chosen
Town planning policy is a set of rules and guidelines that shape how land is used and developed in a town to balance social, economic, and environmental needs.
-
C.
planning commission
A planning commission is a governmental or advisory body responsible for reviewing, guiding, and making recommendations on land use, development proposals, and long-term community planning policies.
-
D.
landmark planning blueprint
A landmark planning blueprint is a strategic, visual, and documented plan that outlines the design, placement, significance, and long-term development of key landmarks within a geographic or urban context.
-
E.
planning agency
A planning agency is an organization responsible for developing, coordinating, and regulating plans and policies to guide land use, infrastructure, and community development within a specific jurisdiction.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca843057b48190a86730167f5d6b98 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 9:05 p.m.