Triple
T10118447
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grain Terminal |
E223222
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | grain terminal |
C27446
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: grain terminal Context triple: [Grain Terminal, instanceOf, grain terminal]
-
A.
coal terminal
A coal terminal is a specialized facility at a port or rail hub designed for the receipt, storage, handling, and loading or unloading of coal for bulk transportation.
-
B.
wood pellet export terminal
A wood pellet export terminal is a specialized port facility designed for the receipt, storage, handling, and loading of wood pellets onto ships for international transport.
-
C.
port crane
A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
-
D.
inland port
An inland port is a logistics and transportation hub located away from coastal seaports, typically along rivers, canals, or rail corridors, that facilitates the transfer, storage, and distribution of goods between different modes of transport.
-
E.
grain market
A grain market is an economic system or physical venue where buyers and sellers trade cereal crops and related commodities, with prices determined by supply, demand, and market regulations.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca8422047c81909d66b717b8b18cf3 |
completed | March 30, 2026, 2:09 p.m. |
Created at: March 30, 2026, 9:04 p.m.