Triple
T10113467
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ridván |
E218297
|
entity |
| Predicate | workSuspendedOnTwelfthDay |
P92273
|
FINISHED |
| Object | true |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: true | Statement: [Ridván, workSuspendedOnTwelfthDay, true]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: workSuspendedOnTwelfthDay Context triple: [Ridván, workSuspendedOnTwelfthDay, true]
-
A.
workSuspensionRequired
Indicates that a temporary halt or suspension of work activities is mandated under certain conditions.
-
B.
suspendedIn
Indicates that one entity is held or maintained within another medium or environment without settling or separating.
-
C.
workOnItEnded
Indicates that an entity’s involvement in working on a particular task, project, or item has come to an end.
-
D.
partiallySuspendedDuring
Indicates that an activity, service, or process is temporarily limited or only partly halted during a specified time or condition, rather than being fully suspended.
-
E.
constructionHalted
Indicates that an ongoing construction activity or project has been stopped or suspended before completion.
- F. None of above. chosen
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca83da93fc8190b54e44bc2b34857c |
completed | March 30, 2026, 2:08 p.m. |
| NER | Named-entity recognition | batch_69cdd15ed28081909a812e0634799ef8 |
completed | April 2, 2026, 2:15 a.m. |
| PD | Predicate disambiguation | batch_69cd4b9ed7e48190aa132ef8a69b49f9 |
completed | April 1, 2026, 4:45 p.m. |
| PDg | Predicate description generation | batch_69cd4f8f869c8190a82ad040993e0244 |
completed | April 1, 2026, 5:02 p.m. |
Created at: March 30, 2026, 9:04 p.m.