Triple

T1010687
Position Surface form Disambiguated ID Type / Status
Subject The Amazing Adventures of Spider-Man – The Ride 4K3D E21814 entity
Predicate upgradeType P23568 FINISHED
Object 4K projection upgrade LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 4K projection upgrade | Statement: [The Amazing Adventures of Spider-Man – The Ride 4K3D, upgradeType, 4K projection upgrade]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradeType
Context triple: [The Amazing Adventures of Spider-Man – The Ride 4K3D, upgradeType, 4K projection upgrade]
  • A. upgradePath
    Indicates the relationship by which one entity can be improved, enhanced, or transitioned into another, typically more advanced, version or state.
  • B. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • C. upgradeFocus
    Indicates a shift of attention or priority from a lower level or version to a higher, improved, or more advanced one.
  • D. upgradeEligibility
    Indicates whether an entity qualifies to move from its current version, level, or plan to a higher or more advanced one under defined criteria.
  • E. upgradePhase
    Indicates the stage or step within a process where an entity is being upgraded or transitioned to a more advanced version or state.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a493c68e24819080ed0ee8bcfd5ce0 completed March 1, 2026, 7:30 p.m.
NER Named-entity recognition batch_69a4b7f4c66c8190b6098fb72c1465a3 completed March 1, 2026, 10:04 p.m.
PD Predicate disambiguation batch_69a4b7203124819091de68cba5f731c1 completed March 1, 2026, 10:01 p.m.
PDg Predicate description generation batch_69a4b7f2d1b081908eb2df54e91c8c1d completed March 1, 2026, 10:04 p.m.
Created at: March 1, 2026, 7:41 p.m.