Triple

T10092296
Position Surface form Disambiguated ID Type / Status
Subject GM T1 platform E215371 entity
Predicate alsoKnownAs P39 FINISHED
Object T1XX platform
The T1XX platform is General Motors’ modular vehicle architecture designed to underpin a range of compact and midsize crossover SUVs across its global brands.
E839841 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: T1XX platform | Statement: [GM T1 platform, alsoKnownAs, T1XX platform]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: T1XX platform
Context triple: [GM T1 platform, alsoKnownAs, T1XX platform]
  • A. Platform 1
    Platform 1 is one of the passenger platforms at Widnes railway station in Cheshire, England, used for boarding and alighting from trains serving the station.
  • B. Platform 1
    Platform 1 is one of the passenger train platforms at Cambridge railway station in Cambridge, England.
  • C. Platform 1
    Platform 1 is one of the passenger boarding platforms at Brentford railway station in London, serving trains on the local rail network.
  • D. Platform 1
    Platform 1 is one of the passenger boarding platforms at Lincoln railway station in Lincoln, England.
  • E. Platform 1
    Platform 1 is one of the passenger train platforms at Southampton Central railway station in Southampton, England.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: T1XX platform
Triple: [GM T1 platform, alsoKnownAs, T1XX platform]
Generated description
The T1XX platform is General Motors’ modular vehicle architecture designed to underpin a range of compact and midsize crossover SUVs across its global brands.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: T1XX platform
Target entity description: The T1XX platform is General Motors’ modular vehicle architecture designed to underpin a range of compact and midsize crossover SUVs across its global brands.
  • A. Platform 1
    Platform 1 is one of the passenger platforms at Widnes railway station in Cheshire, England, used for boarding and alighting from trains serving the station.
  • B. Platform 1
    Platform 1 is one of the passenger train platforms at Cambridge railway station in Cambridge, England.
  • C. Platform 1
    Platform 1 is one of the passenger boarding platforms at Brentford railway station in London, serving trains on the local rail network.
  • D. Platform 1
    Platform 1 is one of the passenger boarding platforms at Lincoln railway station in Lincoln, England.
  • E. Platform 1
    Platform 1 is one of the passenger train platforms at Southampton Central railway station in Southampton, England.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a1eed081908b2e9580f2ebeea7 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd05c3c0c8190927580717429a4e5 completed April 2, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2b6aecc488190a9af098f687327ed completed April 5, 2026, 7:23 p.m.
NEDg Description generation batch_69d2b7bb88348190a39908b34b7419b2 completed April 5, 2026, 7:27 p.m.
NED2 Entity disambiguation (via description) batch_69d2b81e7b948190baa417186aac284b completed April 5, 2026, 7:29 p.m.
Created at: March 30, 2026, 9:01 p.m.