Triple

T10085656
Position Surface form Disambiguated ID Type / Status
Subject Gatun Dam E215212 entity
Predicate hasPowerPlant P9904 FINISHED
Object Gatun hydroelectric plant E215212 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gatun hydroelectric plant | Statement: [Gatun Dam, hasPowerPlant, Gatun hydroelectric plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gatun hydroelectric plant
Context triple: [Gatun Dam, hasPowerPlant, Gatun hydroelectric plant]
  • A. Gatun Dam chosen
    Gatun Dam is a large earth-fill dam in Panama that created Gatun Lake and plays a crucial role in the operation of the Panama Canal.
  • B. Gatun Locks
    Gatun Locks is a major lock complex on the Panama Canal that raises and lowers ships between sea level and Gatun Lake as they transit the waterway.
  • C. Funil Hydroelectric Plant
    The Funil Hydroelectric Plant is a Brazilian power station that generates electricity from the waters of the Paraíba do Sul River.
  • D. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • E. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a1eed081908b2e9580f2ebeea7 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd04609748190987a9364a387fa61 completed April 2, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2cbd822a08190841e51862e5e1e27 completed April 5, 2026, 8:53 p.m.
Created at: March 30, 2026, 9 p.m.