Triple

T10085633
Position Surface form Disambiguated ID Type / Status
Subject Gatun Dam E215212 entity
Predicate locatedBetween P1262 FINISHED
Object Gatun Lake E41866 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Gatun Lake | Statement: [Gatun Dam, locatedBetween, Gatun Lake]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Gatun Lake
Context triple: [Gatun Dam, locatedBetween, Gatun Lake]
  • A. Gatun Lake chosen
    Gatun Lake is a large artificial freshwater lake in central Panama that forms a major part of the Panama Canal’s shipping route across the Isthmus of Panama.
  • B. Gatun Dam
    Gatun Dam is a large earth-fill dam in Panama that created Gatun Lake and plays a crucial role in the operation of the Panama Canal.
  • C. Ciénaga
    Ciénaga is a coastal municipality in northern Colombia known for its Caribbean beaches, historic architecture, and role in the country’s banana-growing region.
  • D. Gatun Locks
    Gatun Locks is a major lock complex on the Panama Canal that raises and lowers ships between sea level and Gatun Lake as they transit the waterway.
  • E. Alajuela Lake
    Alajuela Lake is a major artificial reservoir in central Panama that serves as a key water source for the Panama Canal and surrounding communities.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a1eed081908b2e9580f2ebeea7 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd04609748190987a9364a387fa61 completed April 2, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d2e583ec2c819086429bd6d323d780 completed April 5, 2026, 10:43 p.m.
Created at: March 30, 2026, 9 p.m.