Triple

T10085522
Position Surface form Disambiguated ID Type / Status
Subject Kaniv Reservoir E215209 entity
Predicate hasDam P8736 FINISHED
Object Kaniv Dam E215209 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kaniv Dam | Statement: [Kaniv Reservoir, hasDam, Kaniv Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kaniv Dam
Context triple: [Kaniv Reservoir, hasDam, Kaniv Dam]
  • A. Dnipro Dam
    The Dnipro Dam is a major hydroelectric dam on the Dnieper River in Ukraine, forming one of the country’s largest reservoirs and serving as a key source of power and water management.
  • B. Mozhaysk Dam
    Mozhaysk Dam is a hydraulic structure in Russia that impounds the Mozhaysk Reservoir, serving regional water supply, flood control, and related purposes.
  • C. Grishk Dam
    Grishk Dam is a hydroelectric and irrigation dam located on the Helmand River in southern Afghanistan.
  • D. Tsimlyansk Dam
    Tsimlyansk Dam is a major hydroengineering structure on the Don River in Russia, built to provide hydroelectric power, irrigation, and navigation through the creation of the Tsimlyansk Reservoir.
  • E. Kaniv Reservoir chosen
    Kaniv Reservoir is a large artificial lake on the Dnieper River in central Ukraine, created by the Kaniv Hydroelectric Power Plant dam and used for power generation, navigation, and water supply.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca83a1eed081908b2e9580f2ebeea7 completed March 30, 2026, 2:07 p.m.
NER Named-entity recognition batch_69cdd04609748190987a9364a387fa61 completed April 2, 2026, 2:11 a.m.
NED1 Entity disambiguation (via context triple) batch_69d3174109988190b703bb5b7c89c5c2 completed April 6, 2026, 2:15 a.m.
Created at: March 30, 2026, 9 p.m.