Triple

T10078242
Position Surface form Disambiguated ID Type / Status
Subject Heinkel He 277 E213828 entity
Predicate instanceOf P0 FINISHED
Object German aircraft project C16232 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: German aircraft project
Context triple: [Heinkel He 277, instanceOf, German aircraft project]
  • A. German aircraft
    German aircraft are flying machines designed, manufactured, or operated by German entities, encompassing a wide range of military and civilian types across different historical periods.
  • B. Messerschmitt Me 262 variant
    A Messerschmitt Me 262 variant is a specific model or modification of the German World War II jet fighter, distinguished by changes in armament, engines, airframe, or operational role.
  • C. Luftwaffe air fleet
    A Luftwaffe air fleet is a major operational formation of the German Air Force, comprising multiple air corps and support units organized to conduct large-scale air operations within a designated theater.
  • D. unbuilt aircraft project chosen
    An unbuilt aircraft project is a conceptual or proposed airplane design that was planned and possibly studied or partially developed but never constructed or flown.
  • E. Luftwaffe wing
    A Luftwaffe wing is a major operational air unit of the German Air Force, typically composed of several squadrons or groups equipped and organized to perform specific missions such as air defense, strike, or reconnaissance.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca839bf730819086900c323c9b8c95 completed March 30, 2026, 2:07 p.m.
Created at: March 30, 2026, 9 p.m.