Triple
T10078116
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Monnow Bridge |
E213825
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fortified bridge |
C27383
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fortified bridge Context triple: [Monnow Bridge, instanceOf, fortified bridge]
-
A.
fortified pass
A fortified pass is a strategically important narrow route through difficult terrain that has been strengthened with defensive structures to control movement and resist enemy forces.
-
B.
cast-iron bridge
A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
-
C.
fortified building
A fortified building is a heavily constructed structure designed with defensive features such as thick walls, limited entry points, and protective battlements to resist attacks and provide security for its occupants.
-
D.
iron bridge
An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
-
E.
former bridge
A former bridge is a structure that once functioned as a crossing over an obstacle such as water, a road, or a valley, but has since been decommissioned, repurposed, or rendered unusable for its original bridging purpose.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca839bf730819086900c323c9b8c95 |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 9 p.m.