Triple
T10074633
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bass Harbor–Swan’s Island |
E213718
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Maine State Ferry Service route |
C4626
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Maine State Ferry Service route Context triple: [Bass Harbor–Swan’s Island, instanceOf, Maine State Ferry Service route]
-
A.
Alaska Marine Highway System vessel
An Alaska Marine Highway System vessel is a state-operated ferry ship designed to transport passengers, vehicles, and cargo between coastal communities along Alaska’s marine highway routes.
-
B.
ferry service
chosen
A ferry service is a transportation operation that regularly carries passengers, vehicles, and sometimes cargo across bodies of water along fixed routes and schedules.
-
C.
ferry service network
A ferry service network is a coordinated system of water-based transport routes, vessels, terminals, and schedules that moves passengers and cargo between multiple ports or coastal locations.
-
D.
Amtrak Thruway Motorcoach route
An Amtrak Thruway Motorcoach route is a scheduled bus service that connects passengers to and from Amtrak train stations, extending rail network coverage to areas not directly served by trains.
-
E.
Jumbo Mark II-class ferry
The Jumbo Mark II-class ferry is a large, double-ended passenger and vehicle ferry designed for high-capacity, short-distance routes, featuring multiple vehicle decks and extensive passenger amenities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca839add308190b57d53b4ec21f2d0 |
completed | March 30, 2026, 2:07 p.m. |
Created at: March 30, 2026, 8:59 p.m.