Triple
T10050315
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | OC Streetcar |
E207729
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public transportation project |
C12859
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public transportation project Context triple: [OC Streetcar, instanceOf, public transportation project]
-
A.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
B.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
C.
public transportation funding program
A public transportation funding program is a structured initiative that allocates financial resources to plan, develop, operate, and maintain shared transit services and related infrastructure for the general public.
-
D.
light rail expansion project
chosen
A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
-
E.
rail transit
Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca835ad0608190b7c80b292da004f5 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 8:56 p.m.