Triple

T10042140
Position Surface form Disambiguated ID Type / Status
Subject Operation IRINI E205319 entity
Predicate initialMandateEnd P88884 FINISHED
Object 2021-03-31 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2021-03-31 | Statement: [Operation IRINI, initialMandateEnd, 2021-03-31]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: initialMandateEnd
Context triple: [Operation IRINI, initialMandateEnd, 2021-03-31]
  • A. holderEndDate chosen
    Indicates the date on which an entity’s role as holder of something (e.g., an asset, position, or right) comes to an end.
  • B. grantPeriodEnd
    Indicates the date or point in time when a grant’s active period or eligibility officially ends.
  • C. typicalEndDate
    Indicates the date on which something, such as an event, process, or period, normally or customarily ends.
  • D. monthOfEnd
    Indicates the calendar month in which an event, period, or interval ends.
  • E. deFactoEndDate
    Indicates the date on which a relationship, status, or condition effectively ended in practice, regardless of any formal or official end date.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca834f70e88190b2d74828b7767ec1 completed March 30, 2026, 2:06 p.m.
NER Named-entity recognition batch_69cdcee48d8c8190af7c93b60f8ca7cb completed April 2, 2026, 2:05 a.m.
PD Predicate disambiguation batch_69cd4b8d2280819089de27e57babd1f3 completed April 1, 2026, 4:45 p.m.
Created at: March 30, 2026, 8:55 p.m.