Triple
T10032629
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sound Move |
E204886
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | long-range transportation plan |
C7550
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: long-range transportation plan Context triple: [Sound Move, instanceOf, long-range transportation plan]
-
A.
regional transport plan
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
B.
short-range transportation plan
A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
-
C.
planned transit corridor
A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
-
D.
long-term plan
chosen
A long-term plan is a structured, forward-looking strategy that outlines major goals and the sequence of actions needed to achieve them over an extended period of time.
-
E.
light rail expansion project
A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca834d77188190ad645e33e8ca3200 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 8:54 p.m.