Triple
T10029196
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rio–Niterói Bridge |
E204809
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | box-girder bridge |
C21727
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: box-girder bridge Context triple: [Rio–Niterói Bridge, instanceOf, box-girder bridge]
-
A.
box girder bridge
chosen
A box girder bridge is a type of bridge whose main load-bearing structure consists of hollow, box-shaped girders that provide high strength and torsional rigidity for spanning medium to long distances.
-
B.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
-
C.
truss bridge
A truss bridge is a type of bridge whose load-bearing superstructure is composed of a framework of interconnected triangular units that efficiently distribute forces through tension and compression.
-
D.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
-
E.
reinforced-concrete bridge
A reinforced-concrete bridge is a structural system in which concrete and embedded steel reinforcement work together to safely carry and distribute loads across a span.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca834d77188190ad645e33e8ca3200 |
completed | March 30, 2026, 2:06 p.m. |
Created at: March 30, 2026, 8:54 p.m.