Triple
T10022631
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gemini spacecraft |
E200645
|
entity |
| Predicate | longDurationMission |
P19382
|
FINISHED |
| Object | Gemini 7 |
E86889
|
NE FINISHED |
Disambiguation candidates (2 decisions)
The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Gemini 7 Context triple: [Gemini spacecraft, longDurationMission, Gemini 7]
-
A.
Gemini 7
chosen
Gemini 7 was a 1965 NASA crewed spacecraft mission that conducted a long-duration 14-day flight to study the effects of space travel on the human body and served as the passive target for the first crewed space rendezvous with Gemini 6A.
-
B.
Gemini 9
Gemini 9 was a 1966 NASA crewed spaceflight in the Gemini program that tested rendezvous, docking, and spacewalk procedures in preparation for the Apollo lunar missions.
-
C.
Gemini 6A
Gemini 6A was a 1965 NASA crewed spaceflight that achieved the first successful rendezvous between two orbiting spacecraft during the Gemini program.
-
D.
Gemini 5
Gemini 5 was a 1965 NASA crewed spaceflight that set a then-record for longest human space mission, demonstrating key endurance and rendezvous technologies for the Apollo program.
-
E.
Gemini 8
Gemini 8 was a 1966 NASA crewed spaceflight in the Gemini program, notable for achieving the first successful docking of two spacecraft in orbit and for a critical in-flight emergency that tested astronaut Neil Armstrong’s piloting skills.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: longDurationMission Context triple: [Gemini spacecraft, longDurationMission, Gemini 7]
-
A.
missionDuration
Indicates the length of time over which a mission or operation takes place from start to finish.
-
B.
missionDurationType
chosen
Indicates the classification of a mission’s length or time span (e.g., short-term, long-term, extended).
-
C.
missionDurationPlanned
Indicates the length of time that a mission is scheduled or intended to last according to its plan.
-
D.
missionDurationCapability
Indicates the length of time an entity is capable of sustaining or performing a mission or operation.
-
E.
laterDuration
Indicates that one event or time interval occurs after another and lasts for a specified duration.
- F. None of above.
Provenance (4 batches)
| Stage | Batch ID | Job type | Status |
|---|---|---|---|
| creating | batch_69ca831c45f08190ac1505cc15076608 |
elicitation | completed |
| NER | batch_69cdcd7ae36c8190896946be065fbf78 |
ner | completed |
| NED1 | batch_69d6f6b5338481909e05d82ceb8fadf5 |
ned_source_triple | completed |
| PD | batch_69cd4b7cd4208190b2253583ee2f892c |
pd | completed |
Created at: March 30, 2026, 8:53 p.m.