Triple

T10020667
Position Surface form Disambiguated ID Type / Status
Subject St. Thomas Assembly E200601 entity
Predicate assemblyLayout P63908 FINISHED
Object single main assembly line LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: single main assembly line | Statement: [St. Thomas Assembly, assemblyLayout, single main assembly line]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: assemblyLayout
Context triple: [St. Thomas Assembly, assemblyLayout, single main assembly line]
  • A. assemblySegments chosen
    Indicates that an entity is composed of or associated with specific component segments that together form its assembly.
  • B. assemblyRequired
    Indicates that the associated item or components must be put together or constructed before they can be used.
  • C. assemblyState
    Indicates the current configuration or completeness status of an object or system in its assembly process.
  • D. crewLayout
    Indicates how crew members are arranged or distributed within a vehicle, vessel, or structure.
  • E. wasLaidOutIn
    Indicates that something was arranged, designed, or planned within a particular time period or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca831c45f08190ac1505cc15076608 completed March 30, 2026, 2:05 p.m.
NER Named-entity recognition batch_69cdcd777b208190ad75eac79eec0c2f completed April 2, 2026, 1:59 a.m.
PD Predicate disambiguation batch_69cd4b7cd4208190b2253583ee2f892c completed April 1, 2026, 4:44 p.m.
Created at: March 30, 2026, 8:53 p.m.