Triple

T10004244
Position Surface form Disambiguated ID Type / Status
Subject NASAMS fire distribution center E198202 entity
Predicate instanceOf P0 FINISHED
Object command and control node C13593 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: command and control node
Context triple: [NASAMS fire distribution center, instanceOf, command and control node]
  • A. command-and-control framework
    A command-and-control framework is a structured system that enables centralized coordination, tasking, and monitoring of distributed agents or components, often used to manage operations, automation, or cyber activities.
  • B. deployable air command and control centre
    A deployable air command and control centre is a mobile, rapidly configurable facility that provides the infrastructure, systems, and personnel needed to plan, direct, and coordinate air operations in a given theater.
  • C. central control system chosen
    A central control system is a coordinating entity that monitors, manages, and directs the operations of interconnected components or subsystems to achieve overall system objectives.
  • D. control plane component
    A control plane component is a system element responsible for managing, configuring, and orchestrating the behavior and state of underlying data plane resources within a distributed or networked environment.
  • E. network nodes
    Network nodes are individual connection points within a communication system that can create, receive, or transmit data across the network.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca830fcca48190bbbd9b20c233835f completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 8:51 p.m.