Triple
T10003983
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Carrier Commercial Refrigeration |
E198196
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commercial refrigeration manufacturer |
C136
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commercial refrigeration manufacturer Context triple: [Carrier Commercial Refrigeration, instanceOf, commercial refrigeration manufacturer]
-
A.
ice company
An ice company is a business that produces, stores, and distributes ice for commercial, industrial, and consumer use.
-
B.
absorption refrigerator
An absorption refrigerator is a cooling device that uses a heat source (such as gas, solar, or waste heat) to drive a thermodynamic cycle in which a refrigerant is absorbed and released by a secondary fluid instead of being compressed by an electric motor.
-
C.
manufacturing company
chosen
A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
-
D.
frozen food brand
A frozen food brand is a company or product line that offers pre-packaged, preserved meals or ingredients stored at low temperatures for convenient, long-lasting consumption.
-
E.
refrigerant
A refrigerant is a substance used in cooling systems that absorbs and releases heat as it circulates through phases of compression and expansion.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ca830fcca48190bbbd9b20c233835f |
completed | March 30, 2026, 2:05 p.m. |
Created at: March 30, 2026, 8:51 p.m.