Triple

T10003872
Position Surface form Disambiguated ID Type / Status
Subject Noresco E198192 entity
Predicate instanceOf P0 FINISHED
Object performance contracting company C13492 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: performance contracting company
Context triple: [Noresco, instanceOf, performance contracting company]
  • A. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • B. project management firm
    A project management firm is an organization that plans, coordinates, and oversees projects from initiation to completion, ensuring they are delivered on time, within scope, and on budget for its clients.
  • C. management and operating contractor chosen
    A management and operating contractor is an organization contracted, typically by a government agency, to manage, operate, and often maintain a facility or program on the agency’s behalf under long-term, performance-based arrangements.
  • D. architectural contractor
    An architectural contractor is a professional or firm responsible for managing and executing the construction of buildings according to architectural designs, specifications, and regulatory requirements.
  • E. facility management company
    A facility management company is an organization that plans, operates, and maintains buildings and their services to ensure safe, efficient, and cost-effective environments for occupants and owners.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca830fcca48190bbbd9b20c233835f completed March 30, 2026, 2:05 p.m.
Created at: March 30, 2026, 8:51 p.m.