Triple

T10002716
Position Surface form Disambiguated ID Type / Status
Subject Birchington-on-Sea E197365 entity
Predicate hasRoadAccess P385 FINISHED
Object A28 road E573149 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A28 road | Statement: [Birchington-on-Sea, hasRoadAccess, A28 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A28 road
Context triple: [Birchington-on-Sea, hasRoadAccess, A28 road]
  • A. A28 road chosen
    The A28 road is a major route in southeast England that runs through Kent and East Sussex, linking towns such as Ashford and Canterbury.
  • B. A29 road
    The A29 road is a primary route in southern England that runs through West Sussex, connecting several towns and providing an important north–south link between the South Downs and the coastal areas.
  • C. A22 road
    The A22 road is a major route in southeast England connecting London with Eastbourne on the south coast.
  • D. A25 road
    The A25 road is an important east–west route in South East England that runs through Surrey and connects several towns between Guildford and Sevenoaks.
  • E. A21 road
    The A21 road is a major route in southeast England that connects London with Hastings on the south coast, passing through Kent and East Sussex.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f3b61c81908ecc2c1c96dbc2e4 completed March 30, 2026, 2:04 p.m.
NER Named-entity recognition batch_69cdcd12f6488190bd5257b5f65437cc completed April 2, 2026, 1:57 a.m.
NED1 Entity disambiguation (via context triple) batch_69f60a4d8a3481909c7f8a529d0051c2 completed May 2, 2026, 2:29 p.m.
Created at: March 30, 2026, 8:51 p.m.