Triple

T10000750
Position Surface form Disambiguated ID Type / Status
Subject Pratt & Whitney global maintenance network E197318 entity
Predicate instanceOf P0 FINISHED
Object maintenance, repair and overhaul network C27275 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: maintenance, repair and overhaul network
Context triple: [Pratt & Whitney global maintenance network, instanceOf, maintenance, repair and overhaul network]
  • A. network operations facility
    A network operations facility is a centralized, secure environment where personnel and systems monitor, manage, and maintain an organization’s communication networks and related infrastructure to ensure reliable, efficient, and secure operations.
  • B. manufacturing network
    A manufacturing network is an interconnected system of facilities, suppliers, technologies, and logistics that collaboratively plan, produce, and distribute goods across multiple locations.
  • C. internet infrastructure component
    An internet infrastructure component is a foundational hardware or software element—such as routers, switches, servers, cables, or protocols—that enables the transmission, routing, and reliable delivery of data across interconnected networks.
  • D. network upgrade initiative
    A network upgrade initiative is a coordinated project to enhance an organization’s network infrastructure, capacity, performance, and security to meet current and future business needs.
  • E. networking hardware company
    A networking hardware company designs, manufactures, and sells physical devices and infrastructure that enable data communication and connectivity across computer networks.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ca82f3b61c81908ecc2c1c96dbc2e4 completed March 30, 2026, 2:04 p.m.
Created at: March 30, 2026, 8:51 p.m.