secondReactorCommissioned
P95777
predicate
Indicates that a second reactor at a facility has been formally brought into operational service.
All labels observed (3)
| Label | Occurrences |
|---|---|
| secondReactorCommissioned canonical | 2 |
| reactor2Commissioned | 1 |
| reactor2CommissioningDate | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: secondReactorCommissioned
Generated description
Indicates that a second reactor at a facility has been formally brought into operational service.
Sample triples (4)
| Subject | Object |
|---|---|
| Trawsfynydd nuclear power station | 1965 ⓘ |
| Darlington Nuclear Generating Station | 1990 via predicate surface "reactor2Commissioned" ⓘ |
| Chernobyl Nuclear Power Plant | 1978 via predicate surface "reactor2CommissioningDate" ⓘ |
|
Dungeness nuclear power station
surface form:
Dungeness B nuclear power station
|
1985 ⓘ |