secondReactorCommissioned

P95777
predicate

Indicates that a second reactor at a facility has been formally brought into operational service.

All labels observed (3)

Label Occurrences
secondReactorCommissioned canonical 2
reactor2Commissioned 1
reactor2CommissioningDate 1

Description generation (PDg)

The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.

Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning.  
# Instructions
Focus on describing the relationship, not the entities themselves. 
# Response Format
Begin the description with \' Indicates...\'
Input
Predicate: secondReactorCommissioned
Generated description
Indicates that a second reactor at a facility has been formally brought into operational service.

Sample triples (4)

Subject Object
Trawsfynydd nuclear power station 1965
Darlington Nuclear Generating Station 1990 via predicate surface "reactor2Commissioned"
Chernobyl Nuclear Power Plant 1978 via predicate surface "reactor2CommissioningDate"
Dungeness nuclear power station
surface form: Dungeness B nuclear power station
1985