projectLength
P85699
predicate
Indicates the duration or total time span over which a project is planned or executed.
All labels observed (4)
| Label | Occurrences |
|---|---|
| projectLength canonical | 1 |
| projectLifespan | 1 |
| supportsProjectDuration | 1 |
| typicalProjectDuration | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: projectLength
Generated description
Indicates the duration or total time span over which a project is planned or executed.
Sample triples (4)
| Subject | Object |
|---|---|
| Crenshaw/LAX Transit Project | approximately 8.5 miles ⓘ |
| Food for Progress | 3 to 5 years via predicate surface "typicalProjectDuration" ⓘ |
| Insight Grant | long-term research projects via predicate surface "supportsProjectDuration" ⓘ |
|
Bitrig (historical influence)
surface form:
Bitrig
|
short-lived via predicate surface "projectLifespan" ⓘ |