expectedAnnualGeneration
P81201
predicate
Indicates the amount of output (typically energy or production) that a system or asset is expected to generate over the course of a year.
Observed surface forms (4)
- annualGeneration_GWh ×3
- hasAnnualGeneration_GWh ×2
- estimatedAnnualGeneration_GWh ×1
- estimatedAnnualProduction ×1
Sample triples (9)
| Subject | Object |
|---|---|
| Grand Ethiopian Renaissance Dam | approximately 15000 GWh ⓘ |
|
Vamma power station (nearby on Glomma)
surface form:
Vamma power station
|
1500 via predicate surface "annualGeneration_GWh" ⓘ |
| Arapuni Power Station | around 800 via predicate surface "hasAnnualGeneration_GWh" ⓘ |
| Ohakuri Power Station | 400 via predicate surface "annualGeneration_GWh" ⓘ |
| Long Spruce Generating Station | approximately 5500 via predicate surface "hasAnnualGeneration_GWh" ⓘ |
| Nachtigal Hydropower Project | about 2.9 TWh ⓘ |
| Krasnoyarsk hydroelectric power station | 20000+ via predicate surface "annualGeneration_GWh" ⓘ |
| Khewra Salt Mine | approximately 350,000 tons of salt via predicate surface "estimatedAnnualProduction" ⓘ |
|
Hidroituango (on the Cauca River in Antioquia)
surface form:
Hidroituango
|
13200 via predicate surface "estimatedAnnualGeneration_GWh" ⓘ |