expectedAnnualGeneration
P81201
predicate
Indicates the amount of output (typically energy or production) that a system or asset is expected to generate over the course of a year.
All labels observed (5)
| Label | Occurrences |
|---|---|
| annualGeneration_GWh | 3 |
| expectedAnnualGeneration canonical | 2 |
| hasAnnualGeneration_GWh | 2 |
| estimatedAnnualGeneration_GWh | 1 |
| estimatedAnnualProduction | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: expectedAnnualGeneration
Generated description
Indicates the amount of output (typically energy or production) that a system or asset is expected to generate over the course of a year.
Sample triples (9)
| Subject | Object |
|---|---|
| Grand Ethiopian Renaissance Dam | approximately 15000 GWh ⓘ |
|
Vamma power station (nearby on Glomma)
surface form:
Vamma power station
|
1500 via predicate surface "annualGeneration_GWh" ⓘ |
| Arapuni Power Station | around 800 via predicate surface "hasAnnualGeneration_GWh" ⓘ |
| Ohakuri Power Station | 400 via predicate surface "annualGeneration_GWh" ⓘ |
| Long Spruce Generating Station | approximately 5500 via predicate surface "hasAnnualGeneration_GWh" ⓘ |
| Nachtigal Hydropower Project | about 2.9 TWh ⓘ |
| Krasnoyarsk hydroelectric power station | 20000+ via predicate surface "annualGeneration_GWh" ⓘ |
| Khewra Salt Mine | approximately 350,000 tons of salt via predicate surface "estimatedAnnualProduction" ⓘ |
|
Hidroituango (on the Cauca River in Antioquia)
surface form:
Hidroituango
|
13200 via predicate surface "estimatedAnnualGeneration_GWh" ⓘ |