estimatedStartDate
P77362
predicate
Indicates the date on which something is expected or planned to begin, based on current information or projections.
All labels observed (4)
| Label | Occurrences |
|---|---|
| estimatedStartDate canonical | 7 |
| expectedEventDate | 1 |
| inferredStartDate | 1 |
| planningStartTime | 1 |
Description generation (PDg)
The one-sentence description above was generated by prompting gpt-5.1 with the predicate name and this instruction.
Instruction
Given a predicate that represents a relationship or action between entities, generate a one-sentence description explaining its meaning. # Instructions Focus on describing the relationship, not the entities themselves. # Response Format Begin the description with \' Indicates...\'
Input
Predicate: estimatedStartDate
Generated description
Indicates the date on which something is expected or planned to begin, based on current information or projections.
Sample triples (10)
| Subject | Object |
|---|---|
| Chanhudaro | circa 2600 BCE ⓘ |
| Lothal | c. 2400 BCE ⓘ |
| Operation Marita | 1941-03 via predicate surface "planningStartTime" ⓘ |
| Kuntur Wasi | circa 1200 BCE ⓘ |
| Great Disappointment | 1844-10-22 via predicate surface "expectedEventDate" ⓘ |
| Huaca Prieta | circa 14,000 years ago ⓘ |
| Huaca Prieta | late Pleistocene ⓘ |
| Knap of Howar | circa 3700 BC ⓘ |
| Si Thep | around 6th century via predicate surface "inferredStartDate" ⓘ |
| Buritaca valley settlements | circa 7th century CE ⓘ |